Project Scope

Project National Health Laboratories
Scope of Work Design stage GSAS facilitation
Scope of Work Design stage GSAS facilitation, MEP Design Support and Detail design stageBIM model
Client ASHGAL
Consultant Faithful + Gould
Certification status LOC in progress
Main Contractor To be appointed
GSAS Typology GSAS v2.1 Healthcare
Target Rating 3-Stars
Description:The project is targeting GSAS 3-Star certification under GSASv2.1 Healthcare Typology. Conserve has been appointed by M/s Faithful + Gould to facilitate Design Stage GSAS Gate Submission and to Support the MEP design Calculation for Mechanical, Electrical, Plumbing and Prepare the Detail design stage Coordinated Model for MEP service. During the Design stage we have implemented all the requirements for the sustainability in all the system like HVAC, Plumbing and Electrical. We prepared MEP calculations and LOD 400 BIM model for the following services.
  • Heating ventilation And Air-conditioning
  • Plumbing (Water, Drainage)
  • Fire protection
  • Chilled water
  • Medical gas
  • LPG
  • Small Power
  • Low Current
  • Lighting
  • Earthing and Lightning protection
  • Containment
  • Telephone
  • Exit and Emergency.