Project

C-108-1 Project.

Client

Qatar Armed Forces.

Consultant

White Young Qatar WLL.

Contractor

Bahadir Construction.

Code Used

ASME B31.1.

Software

CAESAR II.

Scope

Performing Stress Analysis for chilled water Piping network.

Project Status

Ongoing.

Discription

  • Performing Stress Analysis for entire chilled water supply and return lines in chiller yard 2301/2302/2303 & 6541 to 6543 & 6306.
  • Performing stress analysis of External buried network.
  • Preparation of load data sheet for all the rigid supports and anchor locations.
  • Support analysis of entire piping network.