Al Bayt Stadium – Al Khor City

Project

Al Bayt Stadium

Consultant

KEO

Client

Supreme Committee

Contractor

GEIC JV

Software

CAESAR II

Code Used

ASME B31.1

Scope of Work

Performed Stress Analysis for Entire Stadium chilled water Piping & Fire Fighting piping.

Project Status

Completed

Description

  • Performed Stress Analysis for entire chilled water supply and return lines inside the ETS Room.
  • Performed Stress Analysis for entire chilled water supply and return lines inside the whole stadium along with Risers.
  • Performed stress analysis for Firefighting piping for entire stadium.
  • Preparation of load data sheet for all the rigid supports and anchor locations.
  • Support analysis of entire piping network.