- Inspire
- Innovate
- Integrate
- Home
- Saudi Arabia AEC1
- Musaimeer Pumping Station & Outfall Tunnel
Musaimeer Pumping Station & Outfall Tunnel
Project
Design & Construction of Musaimeer Pumping Station and Outfall Tunnel.
Client
Public Works Authority – Ashghal
Consultant
Mott MacDonald Limited
Contractor
HBK-PORR JV
LEED Typology
CEEQUAL Version 5 – Design & Construction Assessment
Scope
CEEQUAL Facilitation for Design & Construction Stage .
Achieved certification
Very Good

Description
Conserve has been appointed by M/s HBK-PORR JV to facilitate Design & Construction Stage CEEQUAL Assessment from design documentation to final certification. The project comprises of a pumping station be able to handle a peak flow 19.7 m3/s with a 3.7m diameter marine outfall tunnel for 10 Km and an offshore riser shaft and 84 port diffuser field. The project was delivered with excellence in Sustainability performance becoming first project in Qatar achieve “Very Good” rating.