- Inspire
- Innovate
- Integrate
Project
Crude oil pipeline project
Client
Confidential
Consultant
Confidential
Contractor
Confidential
Scope
Pipe stress analysis.
Project Status
Completed.

Description
Performed sustain stress check, thermal stress check and occasional stress check. Preparation of load case combination for hogging & sagging, blast analysis. To design suitable pipe supports, size spring supports and other pipe support as required.