THREE GAS IN HSBH AND ARBI FIELD

Project Scope

Project Three Gas pdms in hsbh and arbi field
Client Confidential
Consultant Confidential
Contractor Confidential
Project Status Completed.
Scope Performed Stress Analysis of Meg Storage vent line piping for three gas production platforms with associated Subsea line and umbilical tie-ins and hook –up.
Description Dynamic analysis is performed to ensure piping system safe under differential loading. To check whether the stress are within the code allowable. Performed sustain stress check, thermal stress check and occasional stress check. Preparation of load data sheet for occasional conditions. Ensured flange connections are not over stressed and within the acceptable limit. Performed Blast analysis.

Services