Project Scope
Project | Three Gas pdms in hsbh and arbi field |
Client | Confidential |
Consultant | Confidential |
Contractor | Confidential |
Project Status | Completed. |
Scope | Performed Stress Analysis of Meg Storage vent line piping for three gas production platforms with associated Subsea line and umbilical tie-ins and hook –up. |
Description | Dynamic analysis is performed to ensure piping system safe under differential loading. To check whether the stress are within the code allowable. Performed sustain stress check, thermal stress check and occasional stress check. Preparation of load data sheet for occasional conditions. Ensured flange connections are not over stressed and within the acceptable limit. Performed Blast analysis. |