- Inspire
- Innovate
- Integrate
Project
Al Bayt Stadium
Consultant
KEO
Client
Supreme Committee
Contractor
GEIC JV
Software
CAESAR II
Code Used
ASME B31.1
Scope of Work
Performed Stress Analysis for Entire Stadium chilled water Piping & Fire Fighting piping.
Project Status
Completed

Description
- Performed Stress Analysis for entire chilled water supply and return lines inside the ETS Room.
- Performed Stress Analysis for entire chilled water supply and return lines inside the whole stadium along with Risers.
- Performed stress analysis for Firefighting piping for entire stadium.
- Preparation of load data sheet for all the rigid supports and anchor locations.
- Support analysis of entire piping network.