Project

Al Riffa Metro Station.

Client

Confidential.

Consultant

Confidential.

Contractor

Confidential.

Code Used

-

Software

Ansys CFX, Ansys Fluent.

Scope

CFD Analysis of Emergency Ventilation Ducting.

Project Status

Completed.

Discription

  • 3D Model of the complete Emergency Ventilation Ducting System inside the Metro Station.
  • Defining the boundary conditions and input parameters including the fan speed, pressure, and friction losses inside the ducting.
  • Analysis of the system to understand the static pressure across the various sections of the ventilation ducting system.
  • Evaluated the results and noted the critical areas where suction was below the reqirment.
  • Provided suitable Engineering recommendation to overcome the non-conformances noted.