- Inspire
- Innovate
- Integrate
- Home
- Energy & Utilities
- Central utility Plant (CUP3), USA
Central utility Plant (CUP3), USA
Project
Wildcat point generation facility
Client
Confidential
Consultant
Confidential
Contractor
Confidential
Project Status
Completed.
Scope
Structural Engineering Design & Detailing.

Description
Performed Stress Analysis for 36” piping covers Rotating equipment’s. Stress analysis performed for super critical temperature of 1450 F (787.77 C). Support Analysis for entire piping networks. Prepared shop drawing for all types of support in piping network.