Project
Doha north sewage treatment & associated works.
Client
Confidential
Consultant
Confidential
Contractor
Confidential
Project Status
Completed.
Scope
Surge analysis

Description
Performed Surge Analysis for newly added 600 diameter piping system along with submersible pump inside existing tank. Performed Vibration by using dynamic analysis and equivalent static method is carried out to verify stresses and support loads. The analysis was based on the QCS2014 design guidelines. Performed Pump trip and Startup timings. The analysis confirms that the sewage water pumping station require pressure surge protection.