Project
FPSO Gaunabaura MV31 Project.
Client
Confidential
Consultant
Confidential
Contractor
Confidential
Scope
Stress Analysis to check the pipe stress are within code allowables.
Project Status
Completed.

Description
Performed sustain stress check, thermal stress check and occasional stress check. Performed Transportation analysis. Performed Blast analysis. Acceleration loads, Green sea loads, wind loads are considered. Suitable load case has been given and analysis has been done. Ensured flange connections are not over stressed and within the acceptable limit.