Project Scope
Project | FPSO Gaunabaura MV31 Project. |
Client | Confidential |
Consultant | Confidential |
Contractor | Confidential |
Project Status | Completed. |
Scope | Stress Analysis to check the pipe stress are within code allowables. |
Description | Performed sustain stress check, thermal stress check and occasional stress check. Performed Transportation analysis. Performed Blast analysis. Acceleration loads, Green sea loads, wind loads are considered. Suitable load case has been given and analysis has been done. Ensured flange connections are not over stressed and within the acceptable limit. |