- Inspire
- Innovate
- Integrate
Project
FPSO Project
Client
Confidential
Consultant
Confidential
Contractor
Confidential
Scope
Envision Facilitation – Construction Stage
Project Status
Completed.

Description
Performed sustain stress check, thermal stress check and occasional stress check.. Performed Transportation analysis. Performed Blast analysis. Performed load sheet for the anchor supports and other rigid supports. Performed support lift off analysis. Ensured flange connections are not over stressed and within the acceptable limit.