Green Line Metro, Phase 1 (As Built)

Project

Green Line Metro, Phase 1

Client

Qatar Railways Company

Consultant

HOARE LEA QATAR LLC

Contractor

PORR – SBG – HBK JOINT VENTURE

Scope

Preparation of LOD 500 As Built models and drawings by using 3D Laser Scan Point Cloud for MEP and Architecture.

Description

Conserve has been appointed by PSH JV for 3D Laser Scanning and preparing the LOD 500 As-built drawings/model for the Green Line Metro package 3 which includes tunnel, cross passage,Evacuation shaft, trough and AlMesila switch box for both MEP and Architecture. Conserve prepared the As-built layouts from the laser scan point cloud files and implemented the Operation and maintainance details by using the COBie.