Project

Integrated Industrial Wastewater Treatment Works.

Client

Confidential.

Consultant

Confidential.

Contractor

Confidential.

Code Used

-

Software

Ansys CFX, Ansys Fluent.

Scope

Wet Well CFD Analysis.

Project Status

Completed.

Discription

  • 3D Model of the complete pumping station and its geometry from the inlet lift station up to the pump suction including screen, filtration chamber, wet well.
  • Defining the boundary conditions and input parameters including the flowrate of the wastewater along with its density and other parameters.
  • Performed transient analysis of the pumping station to understand the flow pattern of the wastewater and analyze the areas of sedimentation inside the wet well.
  • Provided suitable Engineering recommendation to overcome the non-conformances noted.