Project
Doha Metro – Greenline Underground – White Palaces
Client
Qatar Rail
Contractor
PORR-SBG-HBK Joint Venture
GSAS Typology
GSAS v2.1 Railways
Target Rating
4-Star
Scope
Design & Build (CDA) & Construction Management (CM) GSAS facilitation & & Environmental Permits Handling.
Target Rating
2-Star
Scope
Construction Stage GSAS Facilitation

Description
Green Line Metro’s primary scope is focused upon the design of the 6 stations. There are two types of station Generic I type accounting for 5 stations and Generic X type which accounts for just 1 station on the Green line. We also have switchboxes, crossing boxes, evacuation shafts and cross passages as well as tunnel drainage and tunnel fire fighting.