Project Scope
Project | Design & Construction of Musaimeer Pumping Station and Outfall Tunnel. |
Client | Public Works Authority – Ashghal |
Consultant | Mott MacDonald Limited |
Contractor | HBK-PORR JV |
LEED Typology | CEEQUAL Version 5 – Design & Construction Assessment |
Achieved certification | Very Good |
Scope | CEEQUAL Facilitation for Design & Construction Stage . |
Conserve has been appointed by M/s HBK-PORR JV to facilitate Design & Construction Stage CEEQUAL Assessment from design documentation to final certification. The project comprises of a pumping station be able to handle a peak flow 19.7 m3/s with a 3.7m diameter marine outfall tunnel for 10 Km and an offshore riser shaft and 84 port diffuser field. The project was delivered with excellence in Sustainability performance becoming first project in Qatar achieve “Very Good” rating.