Project

Novo Cinema – Galleria Mall.

Client

Confidential.

Consultant

Confidential.

Contractor

Confidential.

Code Used

-

Software

Ansys CFX, Ansys Fluent.

Scope

Thermal Comfort Study using CFD Analysis – Cinema Hall.

Project Status

Completed.

Discription

  • 3D Model of the complete theatre and its geometry including the location and sizes of the Air outlets.
  • Defining the boundary conditions and input parameters including the temperature, relative humidity, and flow rate at the outlet.
  • Analysis of the system to understand the flow pattern inside the theatre.
  • Evaluated the results and noted the hotspots.
  • Provided suitable Engineering recommendation to overcome the non-conformances noted.