Project

RAS ABU ABOUD STADIUM

Client

HBK Contracting WLL.

Consultant

Meinhardt PTE Ltd.

Contractor

-

Code Used

ASME B31.3.

Software

CAESAR II.CAESAR II.

Scope

Stress & Structural analysis for Storm water piping.

Project Status

Completed.

Discription

  • Stress & Structural analysis for water piping.
  • Support analysis for the entire piping inside pumping station.
  • Structural analysis and shop drawing preparation for the same network.