Ras Abu Aboud Stadium

Project

RAS ABU ABOUD STADIUM

Client

HBK Contracting WLL.

Consultant

Meinhardt PTE Ltd.

Code Used

ASME B31.3.

Software

CAESAR II.

Scope

Stress & Structural analysis for Storm water piping.

Project Status

Completed.

Description

Stress & Structural analysis for water piping.Support analysis for the entire piping inside pumping station.Structural analysis and shop drawing preparation for the same network