- Inspire
- Innovate
- Integrate
- Home
- Piping Stress Analysis Services
- Tamim Air Base Project
Tamim Air Base Project
Project
C-108-1 Project.
Client
Qatar Armed Forces.
Consultant
White Young Qatar WLL.
Contractor
Bahadir Construction.
Code Used
ASME B31.1.
Software
CAESAR II.
Scope
Performing Stress Analysis for chilled water Piping network.
Project Status
Ongoing.

Description
Performing Stress Analysis for entire chilled water supply and return lines in chiller yard 2301/2302/2303 & 6541 to 6543 & 6306.Performing stress analysis of External buried network.Preparation of load data sheet for all the rigid supports and anchor locations.Support analysis of entire piping network.