UNDERGROUND WATER TRANSPORATION PIPELINE PROJECT, DUBAI

Project

Water Transportation project, Dubai.

Client

Confidential

Consultant

Confidential

Contractor

Confidential

Project Status

Completed

Scope

Surge analysis

Description

Performed surge analysis for water transportation pipeline project. Performed Pump trip and Startup timings. As the surge pressure is higher than the design pressure, surge protection tank is to be introduced. As the surge pressure is higher than the design pressure, surge protection tank is to be introduced. Stress analysis performed to ensure piping system under safe loading due to unbalanced pressure thrust.