Project

Workers hospital & integrated health Center-Industrial area.

Client

Private Engineering Office (PEO)-QATAR.

Consultant

Dar AlHandasah.

Contractor

Voltas Limited Qatar.

Code Used

ASME B31.1.

Software

CAESAR II.

Scope

Performed Stress Analysis for existing chilled water Piping.

Project Status

Completed.

Discription

  • Performed Stress Analysis for entire chilled water supply and return lines inside the Tunnel.
  • Preparation of load data sheet for all the rigid supports and anchor locations.
  • Support analysis of entire piping network.