Workers hospital and integrated health Center-Industrial area

Project

Workers hospital & integrated health Center-Industrial area.

Consultant

Dar AlHandasah

Code used

ASME B31.1

Scope of Work

Performed Stress Analysis for existing chilled water Piping.

Client

Private Engineering Office (PEO)-QATAR

Contractor

Voltas Limited Qatar

Software

CAESAR II

Project status

Completed

Description

  • Performed Stress Analysis for entire chilled water supply and return lines inside the Tunnel.
  • Preparation of load data sheet for all the rigid supports and anchor locations.
  • Support analysis of entire piping network.