- Inspire
- Innovate
- Integrate
Project
LNG plant
Client
Confidential
Consultant
Confidential
Contractor
Confidential
Scope
Pipe Stress Analysis & Structural analysis
Project Status
Completed.

Description
Performed Seismic analysis & ensure structural stability of piping system. Performed sustain stress check, thermal stress check and occasional stress check. Performed Transportation analysis. Performed Blast analysis. Suitable load case has been given and analysis has been done. Performed modal analysis, transit analysis & deflection analysis. Performed structural analysis for supporting system.